Bechtel Civil: Athens, Greece |
Athens Metro Status Report. |
Claims Management, Constructability Review |
Eurotunnel, Inc.: English Channel
|
The Channel Tunnel, an $18-billion dollar, three (3) tunnel enterprise running for over 150 km. Two (2) running tunnels, 10.7 meters diameter, and a 6.7 meter diameter service tunnel. All tunnels were excavated by TBM, lined with precast concrete liners. |
Project Controls/ Scheduling, Total Quality Management |
| Hecla Mining Co.; Venezuela |
Manage site contractor, La Camorra Mine. |
Claims Management, Program and Construction Management |
| Idaho National Engineering Laboratory: Idaho Falls, ID |
Controlled schedules, locations, and methods of construction, workforce supervision and adherence to government nuclear standards on a hand-mined tunnel through nuclear contaminated soil at a U.S. DOE site. |
Nuclear Services |
Idaho State Building Authority: Boise, ID
|
Idaho Water Center. |
Program and Construction Management |
Idaho State Capitol Commission: Boise, ID
|
Capitol Building Restoration, Program manager with 3D/International. |
Cost Estimate, Program and Construction Management |
King County: Seattle, WA
|
King Dome Stadium Repairs Workshop. |
Constructability Review |
| Meridian Energy: Manapouri, New Zealand |
Hydro Electric Project Expansion, Additional 10 km Tailrace Siphons, Value Engineering and Disputes Review Panel. |
Constructability Review, Technical Expertise |
| Nevada Department of Energy: Yucca Mountain, NV |
Sub-surface design of a high Level Nuclear Waste Storage Site Characterization program for the Department of Energy; constructed a five-mile 26’-diameter tunnel with supporting shafts using a state of art TBM. Assigned to solve Constructability issues associated with development of the Exploratory Studies Facility, took over as manager of subsurface design for the Department of Energy's Yucca Mountain Project, a $4-6 billion design/construct job targeted for storage of the United State's high-level nuclear waste. Put in charge of a multi-disciplined engineering staff preparing final design analyses, drawings and specifications for construction and operation of an underground exploratory study facility, including final design of five miles of 25-ft diameter, TBM driven tunnel. |
Nuclear Services |
NYC Metropolitan Transit Authority: New York, NY
|
63rd Street Tunnel. |
Constructability Review, Project Controls/ Scheduling |
| San Francisco Airport Authority: San Francisco, CA |
Alternative analysis studies for runway planning. |
Constructability Review, Cost Estimate |
| St. Paul Insurance Company |
Detroit Tunnel Means and methods review. |
Constructability Review, Technical Expertise |
| Washington Public Power Supply System (WPPSS): Satsop, WA |
Project and Area Manager, experience supervising includes projects such as; Washington Public Power Supply System’s Satsop Nuclear Power Plants, Units 3 and 5, a 2.5 billion dollar project. |
Nuclear Services |
| Texas Department of Energy: Waxahia, TX |
Supercollider-Super Conductor (SCC) program estimated $7.5-billion (US) proposed 100 kilometer, 4.5 meter diameter circle tunnel, for use as an atom particle accelerator. Program was terminated halfway through construction. |
Constructability Review |
| U.S. Ecology’s Nuclear Treatment Facility: Oakridge, TN |
Chief of Operations and General Manager. |
Nuclear Services |